Building Code Interpretations

 

Note: These files are in Adobe format, you can download a free copy of the Adobe Reader here.

To search the text of the documents click here and choose the PDF option.

Alberta Building Code 2014 Interpretations

 

 14-BCI-001  Application of Energy Efficiency Requirements and Enforcement Date  Apr. 16
 14-BCI-002  Visual Signals  Mar. 17
 14-BCI-004  Mechanically Vented Appliances  Jun. 17
 14-BCI-005  Rooms Containing Gaseous Chlorine  Jul. 17
 14-BCI-006  Barrier-Free Design Requirements: Relaxations  Jul. 17
 14-BCI-007  Application of the Alberta Building Code for Structural Insulated Panels  Nov. 17

Alberta Building Code 2006 Interpretations

 Index  Building Code Interpretation - Index  Feb. 13
 06-BCI-001-R1  Fire Alarm and Fire Suppression System Verification and Testing Certificates  May 08
 06-BCI-002  Natural Gas Regulating and Metering Station Buildings  Sept. 07
 06-BCI-003  Rooms Containing Gaseous Chlorine  Reissued as 14-BCI-005
 06-BCI-004  Row Housing, Duplexes and Condominiums  Sept. 07
 06-BCI-005-R1  Two-Hour Fire Walls  Feb. 08
 06-BCI-006  Roof Anchors Reissued as 14-BCB-002
 06-BCI-007R1  Secondary Suites (Withdrawn)  Feb. 13
 06-BCI-008  Buildings Used for the Storage, Repair or Servicing of Tank Vehicles  Nov. 07
 06-BCI-009  Manufactured Solariums, Greenhouses and Sunrooms for Residential Use (Withdrawn)  Nov. 07
 06-BCI-010  Adaptable Dwelling Units  (Withdrawn)  Mar. 08
 06-BCI-011R2  Visual Signal Appliances for Fire Alarm Systems

 Reissued as 14-BCI-002

 06-BCI-012  Hydronic Heating Systems  Feb. 08
 06-BCI-013  Determination of Grade  May 08
 06-BCI-014  Minimum Thickness of Footings  May 08
 06-BCI-015  Manufactured Structural Components  May 08
 06-BCI-016  Stairs in Dwelling Units  Feb. 09
 06-BCI-017  Sealing of Joints in Ventilation Systems Ductwork  May 09
 06-BCI-018  Tall Wall Generic Engineering Details  Reissued as 14-BCV-002
 06-BCI-019  Barrier-Free Access to Stages  June 09
 06-BCI-020  Post-Disaster Buildings Housing Emergency Response Vehicles and Personnel  June 09
 06-BCI-021  HIRF - Floor-to-Floor Fire Compartments  June 09
 06-BCI-022  HIRF - Separation of Glazed Openings (Withdrawn)  June 09
 06-BCI-023  HIRF - Attached Garage Insulation Values (Withdrawn)  July 09
 06-BCI-024  Over-the-Range (OTR) Microwaves (Withdrawn)  June 09
 06-BCI-025  Fire Department Response Time  Oct. 09
 06-BCI-026  Day Care Facility Location Restrictions (Withdrawn)  Feb. 10
 06-BCI-027  Day Care Classifications (Withdrawn)  Feb. 10
 06-BCI-028  Elevators and Passenger-Elevating Devices  Reissued as 14-BCV-006
 06-BCI-029  Retaining Walls  Apr. 10
 06-BCI-030R1  Wind Turbines  Sept. 10
 06-BCI-031  Lateral Bracing of Residential Concrete Foundation Walls Generic Engineering Details (Withdrawn)  Sept. 10
 06-BCI-032  Mechanically Vented Appliances  Reissued as 14-BCI-004
 06-BCI-033  Waterless Urinals (Withdrawn)  Sept. 12
  • Date modified: 2017-11-14